Report Type Uploaded Works
Material Test 26 / Aug / 2021 Construction of Pilgao –Narva Distributory of LBMC of TIP from Ch.12.33 km. to tail end at village Narva,Mayem in Bicholim Taluka.
Cube Test 26 / Aug / 2021 Desilting of Rivulets /Poi, Agriculture fields and reconstruction of existing sluice in Savat Khazan and kharat khazan field at Shirgao in Bicholim Taluka. Sub Est.IV:-Reconstruction of sluice (Near Mharingan Temple) in Kharat Khazan at Shirigao village
Cube Test 26 / Aug / 2021 Construction of Bandhara (Rajwalacho bandh) at village Golauli in V.P.Dongurli Thane in Sattari Taluka.
Cube Test 26 / Aug / 2021 Desilting of Rivulets /Poi, Agriculture fields and reconstruction of existing sluice in Savat Khazan and kharat khazan field at Shirgao in Bicholim Taluka. Sub Est.IV:-Reconstruction of sluice (Near Mharingan Temple) in Kharat Khazan at Shirigao village
Material Test 26 / Aug / 2021 Improvement to existing Bandhara at D/S of vehicular bridge at Assonora. Regarding construction of side protection wall at RHS Bank of Assonora.
Cube Test 26 / Aug / 2021 Improvement to Bastora Minor 2 Branch 3 and Bastora Minor 3/OL2 of Calangute Distributory of LBMC in Guirim and Sangolda village of Bardez Taluka.
Material Test 26 / Aug / 2021 Improvement to waterway of Nallah by construction of protection wall in the field of Shri.Purushottam Khadilkar in Sy.No 12/1 at Brahmakarmali in V.P.Nagargao in Sattari Taluka.
Cube Test 26 / Aug / 2021 Desilting of Rivulets /Poi, Agriculture fields and reconstruction of existing sluice in Savat Khazan and kharat khazan field at Shirgao in Bicholim Taluka. Sub Est.IV:-Reconstruction of sluice (Near Mharingan Temple) in Kharat Khazan at Shirigao village
Cube Test 26 / Aug / 2021 Construction of Barrage and up gradation of Raw water pumping station at Ganjem on Mhadei River for Augmentation of Raw water for Opa water works. Part II- Upgradation of pump house including supply and installation of pumps,motors,control panel and subs
Cube Test 26 / Aug / 2021 Construction of Anjuna Distributory taking off at ch.28.970km of the left Bank Main canal of Tillari irrigation Project in Siolim & Anjuna village of Bardez Taluka.part II:Construction of Rising Main and reinstatement of allied structures of Anjuna Dist

Pages

गोवा जलसंपदा विभागात आपले स्वागत आहे

महत्वपूर्ण दुवे

ही वेबसाइट भारत सरकारच्या गोवा राज्य सरकारच्या जलसंपत्ती विभागाशी संबंधित आहे.

Search form

या साइटवर वैशिष्ट्यीकृत साहित्य पुनरुत्पादित केले जाऊ शकते विशिष्ट परवानगीशिवाय कोणत्याही स्वरुपात किंवा माध्यमामध्ये. हे विषय आहे सामग्री अचूकपणे पुनरुत्पादित केली जात आहे आणि अपमानास्पदपणे वापरली जात नाही रीतीने किंवा दिशाभूल संदर्भात. जेथे सामग्री प्रकाशित केली जात आहे किंवा इतरांना दिलेले, स्त्रोत प्रामुख्याने स्वीकारले पाहिजे. तथापि, हे या सामग्रीची पुनरुत्पादन करण्याची परवानगी यावरील कोणत्याही सामग्रीवर विस्तारित करीत नाही साइट, जी स्पष्टपणे तृतीय पक्षाची कॉपीराइट म्हणून ओळखली जाते. अशा सामग्रीची पुनरुत्पादन करण्यासाठी अधिकृतता कॉपीराइटकडून प्राप्त करणे आवश्यक आहे संबंधित धारक.
अखेरचे पुनरावलोकन केले आणि अद्यतनित केले 26 Jun, 2025
Feedback