Report Type Uploaded Works
Cube Test 24 / Aug / 2021 Construction of Anjuna Distributory taking off at ch.28.970km of the left Bank Main canal of Tillari irrigation Project in Siolim & Anjuna village of Bardez Taluka. Part II:Construction of Rising Main and reinstatement of allied structures of Anjuna Dis
Cube Test 24 / Aug / 2021 Construction of Barrage and up gradation of Raw water pumping station at Ganjem on Mhadei River for Augmentation of Raw water for Opa water works. Part I- Construction of Barrage providing and laying 1000mm dia D.Ipipe Rising main and Break Pressure Tan
Cube Test 24 / Aug / 2021 Construction of Anjuna Distributory taking off at ch.28.970km of the left Bank Main canal of Tillari irrigation Project in Siolim & Anjuna village of Bardez Taluka.part II:Construction of Rising Main and reinstatement of allied structures of Anjuna Dist
Material Test 24 / Aug / 2021 Construction of Tail Minor, DO’s, WC’s and FC’s of B/4 distributary and DWC 19L off taking at Ch.18.005km of RBMC of TIP at village Dhargal in Pernem Taluka
Cube Test 24 / Aug / 2021 Providing barbed wire fencing 1.20 mt height on L.H.S and R.H.S side of R.C.C box conduit from ch.31.040 km to 31.835 km along LBMC of TIP in Mapusa city of Bardez Taluka.
Material Test 24 / Aug / 2021 Improvement to the Nallah behind Hotel Terra Pariaso at Gaura Vaddo Calangute in Calangute Constituency.
Cube Test 24 / Aug / 2021 Desilting of Rivulets /Poi, Agriculture fields and reconstruction of existing sluice in Savat Khazan and kharat khazan field at Shirgao in Bicholim Taluka. Sub Est.III:-Reconstruction of sluice (Navi Manas) in Kharat Khazan at Shirigao village in Bicholim
Material Test 24 / Aug / 2021 Improvement to the protection wall for an existing nallah from Vishwas Gaonkar house upto Prakash house and from Domnic D’Souza house upto Pandhari Divkar house at Naik Waddo,Calangute in Calangute Constituency.
Material Test 24 / Aug / 2021 Improvement to Nallah by construction of protection wall in Survey No. 12/1 & 13/7 at Gaonkarwada in Norao Village of Bicholim Taluka.
Cube Test 24 / Aug / 2021 Construction of Anjuna Distributory taking off at ch.28.970km of the left Bank Main canal of Tillari irrigation Project in Siolim & Anjuna village of Bardez Taluka.part II:Construction of Rising Main and reinstatement of allied structures of Anjuna Dist

Pages

गोवा जलसंपदा विभागात आपले स्वागत आहे

महत्वपूर्ण दुवे

ही वेबसाइट भारत सरकारच्या गोवा राज्य सरकारच्या जलसंपत्ती विभागाशी संबंधित आहे.

Search form

या साइटवर वैशिष्ट्यीकृत साहित्य पुनरुत्पादित केले जाऊ शकते विशिष्ट परवानगीशिवाय कोणत्याही स्वरुपात किंवा माध्यमामध्ये. हे विषय आहे सामग्री अचूकपणे पुनरुत्पादित केली जात आहे आणि अपमानास्पदपणे वापरली जात नाही रीतीने किंवा दिशाभूल संदर्भात. जेथे सामग्री प्रकाशित केली जात आहे किंवा इतरांना दिलेले, स्त्रोत प्रामुख्याने स्वीकारले पाहिजे. तथापि, हे या सामग्रीची पुनरुत्पादन करण्याची परवानगी यावरील कोणत्याही सामग्रीवर विस्तारित करीत नाही साइट, जी स्पष्टपणे तृतीय पक्षाची कॉपीराइट म्हणून ओळखली जाते. अशा सामग्रीची पुनरुत्पादन करण्यासाठी अधिकृतता कॉपीराइटकडून प्राप्त करणे आवश्यक आहे संबंधित धारक.
अखेरचे पुनरावलोकन केले आणि अद्यतनित केले 26 Jun, 2025
Feedback